Waste utilization for energy production in Montenegro

Project code: 19/WBGC-2020/1

Beneficiary: Wessling Hungary Kft.

Year established: 1992

Profile: technical testing, analysis

Location: Montenegro

Local organization: Municipalities of Niksic and Pljevlja

Total budget: HUF 33 000 000 / EUR 93 484   

Grant amount: HUF 26 300 000 / EUR 74 504

Timeframe: 1 June 2020 – 30 June 2021

Project website: https://hu.wessling-group.com/hu/


This feasibility study addresses how using waste as fuel could deliver measurable benefits in landfills as well as in the CO2 and slurry emission of the local power plant. Current landfills will be evaluated, quantifying the possible amount of waste to be utilized. Waste production will be evaluated based on potential to be sorted and shredded for secondary raw material. Based on these measures the amount of RDF (Refuse Derived Fuel) and SRF (Solid Recovered Fuel) can be estimated. SRF is a high-quality alternative to fossil fuels to be used in the powerplant after the furnaces are modified. The economic analysis covers a basic ROI calculation of the whole project.

TARGET

INDICATOR

ESTIMATED IMPACT

Improved climate performance

reduced methane emission

4.5 kt/yr

reduced waste

15 kt/yr

Improved resource efficiency

reduced use of fossil fuels

20 kt/yr 

Education

Entities reached

130

Sustainable Development Goals:

e-web-goal-03.pnge-web-goal-09.pnge-web-goal-11.pnge-web-goal-13.pnge-web-goal-15.png