Project code: WBGC-2020 / 2-2020-00031
Beneficiary: Smart Energy Investment Ltd.
Year established: 2016
Profile: electrical installation
Location: Valjevo city and surrounding settlements, Serbia
Local organizitaion: Municipalities of Valjevo and surrounding municipalities, Serbia
Total budget: HUF 43,859,226
Grant amount: HUF 29,000,000
Timeframe: January 2, 2021 - August 31, 2021
Project page: ongoing
The project includes the measuring of the entire public lightning infrastructure in the city of Valjevo and the surrounding communities (these communities and the city together form a municipal unit - Valjevo). Every public lighting technical equipment and the associated electrical network is measured, lighting situations are typified, technical, energy and economic calculations are performed, photometric measurement, energy planning, cost-benefit analysis, investment risk analysis and the realization of SMART CITY are considered. In addition, during the primary energy audit, the electricity consumption data used for public lighting is obtained for minimum one year backwards, also the measuring points and the costs of maintaining the system are analysed. Based on the examinations during the primary energy audit and its results a feasibility study is prepared.
TARTGET |
INDICATOR |
ESTIMATED IMPACT |
Improved climate performance |
Greenhouse gas (GHG) emissions reduction-carbon dioxide |
2,114.7 t / year |
More efficient resource management |
Energy-Energy obtained from renewable energy sources |
12,000 kwh / year |
Reduced resource use (excluding energy) -Raw material |
2,122.19 t / year |