Project code: 55/WBGC-2020/1
Beneficiary: VTK Innosystem Llc.
Year established: 1989
Profile: engineering services, technical advisory
Location: Subotica, Serbia
Local organization: JKP Vodovod I Kanalizacija Subotica (Water Supply and Sanitation)
Total budget: HUF 50 000 000 / EUR 141 643
Grant amount: HUF 35 700 000 / EUR 101 133
Timeframe: 1 June 2020 – 30 June 2021
Project website: https://vtkinnosystem.com/
The goal of the project is to execute an in-depth survey of the endangered and heavily polluted Lake Palic and to propose a detailed set of measures based on the findings. Based on the methodology of DPSIR (driving forces, pressures, states, impacts, responses) published by the European Environment Agency, the goal is to identify the most impactful climate, environmental and water management factors that are responsible for the situation. In the framework of the preliminary study the main problems are identified. In the framework of the feasibility study with the identification of critical intervention points the necessary conceptional measures are proposed.
TARGET |
INDICATOR |
ESTIMATED IMPACT |
---|---|---|
Improved climate performance |
improved water quality |
10 Mt/yr |
treated wastewater |
11 Mt/yr |
|
Communication, Education |
individuals reached |
4 590 |
Sustainable Development Goals: